  • CodeCampV

    v15 v16  
    88== Initial Goals == 
    99 
     10!SasView version 4.0 was released before the Code Camp, completing the work from the [wiki:CodeCampIV previous Code Camp in Delft] 
     11 
     12The primary goals of this code camp were those from the [https://github.com/SasView/documents/blob/master/SasView%20Roadmap.md roadmap], namely: 
     13 
     14* TBA from list of tickets 
     15 
     16* Add a new corfunc perspective 
     17 
     18* Added file converter to support multifile data 
     19 
     20* Integrate SESANS into the SasView GUI 
     21 
     22* Fix Save Project when constrained fits are used 
     23 
     24* Continue work on GUI refactoring (and the clean separation of UI from computational code). 
     25 
     26* Work on increasing model coverage looking at non-overlap with SASfit models. 
     27 
     28* Begin work refactoring/clean-up of Batch fitting (to include batch operations on roi such as box sum and slices).  
     29 
     30* Finish model documentation review and formating 
     31 
     32* Add missing documentation and documentation of new functionality 
     33 
     34* Work on improving infrastructure (build systems, 64 bit/Anaconda on all platforms of build machines, trac, licensing, etc) 
     35 
     36These tasks build on the work done for release 4.0 and are aimed at a 4.1 release in late 2016/early 2017. The major items for this release are the integration of SESANS analysis, improvements to the Save Project functionality, inclusion of some models from SasFit, enhanced documentation and improved reliability. 
     37 
     38The work on GUI refactoring that was started at the Delft Code Camp continues as a contribution to the project from ESS under the SINE2020 project.  
    1039== Participants == 
    1140 
     
    1746== Progress and Outcomes == 
    1847 
     48This code camp brought 13 developers together to work for 7 days on the  [http://github.com/sasview/sasview SasView] and [http://github.com/sasview/sasmodels sasmodels] code, documentation, and development infrastructure. One new developer, Dirk Honecker from ILL, joined the project. 
     49 
     50The camp began with introductions and updates from all the partner labs. 
     51 
     52To focus the work for the code camp, the management team made a proposal as to what functionality should be targeted for a v4.1 release in late 2016. In order to achieve this, the development team was placed in [wiki:CodeCampVWorkingGroups groups] focussing on: 
     53* New GUI  
     54* SESANS analysis integration 
     55* Sasmodels bug fixing and enhancement 
     56* SasView bug fixing and enhancement 
     57* Documentation & Training 
     58* Developer Infrastructure 
     59 
     60 
     61 
    1962=== Code Stats === 
     63Over the camp [[TicketQuery(changetime=2016-10-03..2016-10-11&status=closed,group=milestone,desc=1,count)]] tickets were closed.  
     64 
     65Over the period of the camp, ten developers contributed to the [http://github.com/sasview/sasview SasView code repository]. There were 113 commits to all branches and master had 344 files changed with 79,668 additions and 39,499 deletions. 
     66 
     67There were contributions from 10 developers to the [http://github.com/sasview/sasmodels sasmodels code repository]. There were 52 commits to all branches and master had 1 pull request and a total of 46 commits. 57 files changed with 1,462 additions and 550 deletions. 
    2068 
    2169== Next Steps == 
     
    2371== Photos == 
    2472 
     73[https://flic.kr/s/aHskJrKEMo All photos from the code camp on Flickr] 
     74 
    2575 
    2676== Ticket Summary ==